Aside from the construction of the incorporated greenway, masterplan upgrades additionally contain the construction of mega blocks or huge-scale trends, and maximization of the land use of Festival Mall as the metropolis center.
Part of that is the addition of a new wing for the mall, together with a 4-story Landmark branch shop. This is predicted to add a hundred and fifty,000 square meters of gross ground location to the mall’s inventory and is ready to be completed by year end.
Furthermore, Ilagan mentioned that FAI is currently building key projects to high the town’s boom. Of those are excessive-quit residential trends Botanika Nature Residences Tower I and Bristol at Parkway Place, and an workplace condominium challenge called Parkway Corporate Center, all of that are set to be completed in within the subsequent 3 years.